January 04 2007
1.9 inches of rain!
Worked with drainage for erosion control along gravel road and throughout.
This entry was posted on Thursday January 04 2007 at 5:32 pm and is filed under 2007 Journal, Erosion You can follow any responses to this entry through the RSS 2.0 feed.