Waterstone Wildlife home

January 29 2007

Maintenance to prepare for predicted arctic blast. Extended hard freeze next week.

  • Charged batteries and added water to 2 6 volt solar batteries.
  • All 3 well outlets were wrapped and left dripping
  • Wrapped outside faucets and left lil' guzzler
  • Replaced water pump at rain barn for lil' guzzler

Washed raccoon droppings from steps and chlorinated area to disinfect and reduce the spread of distemper disease.

Walked the land and sprayed all raccoon droppings throughout with chlorine and water solution.

<< Previous Entry

Next Entry >>

web application - database development by davidcdalton.com

New Site